Construction & remodeling · San Diego

Spaces to live.
Room to dream.

Your vision, built by our own trusted crew. Residential construction and commercial remodeling in San Diego, with hands-on care from the people doing the work.

Kitchen with a navy-blue island, white cabinetry, blue tile backsplash and light stone countertops.
Our work A Dreamland kitchen project
Kitchen & bathWhole-home remodelingADUs & additionsCommercial spaces
What we do

A fresh perspective.
A space that fits.

From the home you love to the business you’re building, explore construction and remodeling shaped around your needs.

Dreamland shower with large marble-look wall panels, a recessed niche, black fixtures and a glass door

For your home

Make everyday living feel more like you. Kitchens, bathrooms, whole-home transformations, additions and ADUs.

RemodelingAdditionsADUs
Open office with glass partitions, wood flooring and shared workspaces

For your business

Create a welcoming place to work, meet and connect. Remodeling for offices, shared areas, dining spaces and restrooms.

OfficesShared spacesInteriors
Project portfolio

See how the work
comes together.

Step inside a Dreamland project—from the original space, through construction, to the finished result.

San Diego · ZIP 92127 · January 2026 · 14 project photos

Waterfall Kitchen & Appliance Garage

See a dated white kitchen become a bright custom workspace with an appliance garage, full-height veined surfaces and a dramatic waterfall counter.

01Before 4 photos02During 6 photos03After 4 photos
More of our work

Select a project to explore its transformation.

Project journey

Waterfall Kitchen & Appliance Garage

See a dated white kitchen become a bright custom workspace with an appliance garage, full-height veined surfaces and a dramatic waterfall counter.

01 / BEFORE

Before

The original cabinet layout, counters and appliance wall before work began.

Original appliance wall before removal
Existing peninsula and cabinet layout
Original sink wall and work surfaces
Existing range and storage wall
02 / DURING

During

Protected surroundings, cabinet fitting and precision stone installation as the new kitchen takes shape.

Dust containment protects the surrounding home
Waterfall counter installation underway
Full-height stone surfaces fitted
Stone fitted around cabinetry and window
Final cabinet and countertop adjustments
Cooktop fitting during final adjustments
03 / AFTER

After

The completed kitchen, including its appliance garage, fitted appliances and continuous waterfall surfaces.

Completed kitchen and waterfall counter
Finished cabinet and appliance layout
Waterfall edge and appliance garage
Bright finished kitchen from the entry
Project journey

Spa Bathroom & Custom Corner Shower

A complete primary bath remodel with a dark double vanity, jetted corner tub, open custom shower and continuous marble-look surfaces.

01 / BEFORE

Before

The original primary bathroom layout before demolition.

Original tub and shower layout
02 / DURING

During

Demolition, plumbing preparation and careful surface installation for the new wet-area layout.

Bathroom opened for demolition
Vanity and shower zones cleared
Floor opened for the new drain layout
Large-format surfaces aligned
Custom shower floor and linear drain installed
03 / AFTER

After

The finished spa bath, ready for use with its jetted tub, open shower and coordinated finishes.

Completed spa bath and open shower
Jetted tub wrapped in veined surfaces
Open shower with matte-black fixtures
Dark double vanity completes the layout
Project journey

Fireplace & Built-In Feature Wall

A blank media wall transformed into a full-height stacked-stone feature with a linear fireplace and custom white built-in storage.

01 / BEFORE

Before

The original media wall before the new fireplace and built-ins were installed.

Blank media wall before construction
02 / DURING

During

Cabinet layout, firebox installation and full-height stonework, with nearby flooring protected.

Feature wall cleared and millwork staged
Crew lays out the cabinet base
Base cabinets leveled over protected floors
Built-ins and firebox aligned
Linear firebox integrated
Fireplace tested before stonework
Stacked-stone cladding begins
Stone feature wall reaches full height
03 / AFTER

After

The completed media wall with built-in storage, warm fireplace and floor-to-ceiling stone.

Finished feature wall from the living room
Linear fireplace and custom storage
Completed stonework and cabinetry
Full completed fireplace wall
Project journey

Two-Tone Kitchen Remodel

Follow a fast full-kitchen transformation from the original white layout through demolition to warm wood lower cabinets, bright uppers and fresh work surfaces.

01 / BEFORE

Before

The kitchen at project start, with the island counter removed and initial work underway.

Kitchen at the start of the remodel
Existing storage and appliance layout
02 / DURING

During

The room is cleared, surfaces are prepared and the new two-tone cabinetry is fitted.

Old finishes removed
Room cleared for the new layout
Walls prepared for installation
Materials staged over protected floors
Debris contained outside the work area
Final wall and ceiling preparation
03 / AFTER

After

The completed two-tone kitchen and custom coffee-bar storage, ready for everyday use.

Completed kitchen opens to the living space
Finished custom coffee bar
Warm wood storage with white uppers
Fitted appliances and fresh lighting
Coffee-bar cabinetry and counter detail
Project journey

White Shaker Kitchen Remodel

A full kitchen update with white Shaker cabinetry, new counters, tile flooring, gray walls, recessed lighting and a more useful work triangle.

01 / BEFORE

Before

The kitchen at project start, with early cabinet removal and materials staged for the remodel.

Kitchen at the start of the renovation
02 / DURING

During

Dust containment, demolition and a detailed cabinet installation shown step by step.

Dust containment seals the work area
Adjoining floors and doorway protected
Room cleared during demolition
White Shaker cabinet installation begins
Appliances set as cabinetry takes shape
Peninsula storage assembled and aligned
Upper cabinets fitted around the window
Cabinet installation nears completion
Final cabinet adjustments before counters
03 / AFTER

After

The finished kitchen with white Shaker cabinetry, new work surfaces, appliances and lighting.

Finished white Shaker kitchen
Completed cabinet wall and work triangle
Bright finished kitchen from the peninsula
Project journey

Blue & Gold Bathroom Remodel

A full bathroom remodel that adds a dual-sink vanity and pairs vertical blue shower tile, gray hex flooring and brushed-gold fixtures.

01 / BEFORE

Before

The original enclosed shower and toilet area before demolition.

Original shower and toilet area
02 / DURING

During

Demolition, wall and plumbing work, followed by careful preparation for the new shower and vanity.

Vanity and wall surfaces removed
Shower enclosure opened to the framing
Plumbing opened for the new layout
Shower zone prepared for waterproofing
Walls closed and ready for finishes
Dual-sink vanity installed and being leveled
03 / AFTER

After

The finished shower with blue tile, gray hex flooring, glass enclosure and brushed-gold fixtures.

Finished blue-tile shower with gold fixtures
Glass enclosure and coordinated tilework
Project journey

Detached ADU — Built from the Ground Up

A detached accessory dwelling unit (ADU), built from the ground up in San Diego. Follow the transformation from a backyard site through foundations, framing and interior finishes to a separate living space with its own kitchen and bathroom.

01 / BEFORE

Before

The backyard footprint and existing concrete before excavation for the new detached ADU.

Backyard and existing patio
The starting site
02 / DURING

During

Site preparation and foundations, wall and roof framing, plumbing and insulation, then the kitchen, bathroom, flooring and exterior finishes.

Removing the existing concrete
Grading the backyard
Laying out the foundation
Foundation ready for concrete
Pouring the slab
A new foundation in place
Walls begin to rise
Framing the rooms and roof
Enclosing the building
Services inside the walls
Insulating the shell
Bathroom plumbing preparation
Closing in the interiors
Fitting the kitchen cabinets
Setting the shower tile
Installing the flooring
Connecting exterior services
Exterior finishes take shape
Finishing the outdoor access
03 / AFTER

After

The completed detached building, its own kitchen and bathroom, finished rooms and outdoor access.

The completed building and path
A complete compact kitchen
Kitchen and living space connected
Bright finished interiors
Glass shower and warm metal details
Vanity and illuminated mirror
Lighting and comfort in the bedroom
A defined side entry
Project journey

Nail Salon Build-Out

Follow a commercial nail salon build-out from plumbing beneath the floor and interior framing to installed pedicure stations, manicure tables, lighting and finishes. These project photos trace the work through the salon’s final setup.

01 / DURING

During

The build-out from exposed services and floor repairs through interior finishes and station installation.

Opening the floor for new services
Routing the station plumbing
Closing the floor around the rough-ins
Forming the ceiling details
Preparing services inside the walls
Defining the interior with drywall
Bringing contrast to the ceiling
Starting the new tile floor
Extending the floor through the salon
Setting the salon equipment
Lighting the new layout
Fitting the supporting cabinetry
Finishing the support rooms
Arranging the service stations
02 / FINISHING TOUCHES

Finishing touches

Installed seating, workstations, lighting and interior finishes as the salon takes shape.

The fitted salon layout
Pedicure seating in place
Seating and workstations together
Manicure tables and coordinated seating
Project photo

Completed project

Use the arrows to continue through this project.
Dreamland fireplace wall with textured stone facing, a linear fireplace and white built-in cabinets
The people behind the work

Your vision.
Our own crew.

We’re the contractor doing the work. Dreamland Construction brings its own experienced, dependable in-house crew to homes and businesses across San Diego.

Many of our workers have been with us for years. Working with people we know and trust means hands-on quality control, clearer communication and consistent workmanship as your project takes shape.

Dreamland Construction · San Diego, CA
Meet your construction team
A clear place to start

Big ideas begin
with a conversation.

You don’t need every detail figured out.
Start by telling us what you have in mind.

01 / CONNECT

Tell us your idea

Call or email with a brief description of your project and the best way to reach you.

02 / EXPLORE

Talk through the details

Discuss your space, priorities and questions during your free consultation.

03 / PLAN

Discuss the next steps

Ask about scope, materials, scheduling and what your project may need before work begins.

Your next chapter starts here

Have a space in mind?
Let’s talk about it.

Tell us what you’re planning. Request a free consultation for your home or commercial property.